Construction of a municipal power plant, Austria
Judenburg
Project:
The new Judenburg municipal power plant will replace three old power plants on the Mur River. A modern power plant combining energy supply, efficiency, and sustainability will be built in 26 months.
At the same time, ecological measures such as nesting boxes, deadwood piles, and 5,000 newly planted trees will ensure the protection and preservation of biodiversity along the Mur River.
A pioneering project that harmonizes technology and nature.
Delivery Quantity:
150 VL607 S355GP, length 18 m, 606.96 t