Dam adaptation Rußbach

Lower Austria

Project:
Dam adaptation Rußbach, Lower Austria
Client:
Rußbach water board, Deutsch-Wagram
Construction company:
Administration of Lower Austria - water engineering, Mistelbach
Delivered quantity:
Lightweight Sections FLP 700-6 From 2.0 to 4.0 m 1,250 tons